|
|
|
|
|
|
|
Additional Product Information
Installation Instructions:
1. Install Hi-Flow shut-off valve to inlet side of tank (optional/if provided). 2. Connect water source to the inlet of the deionizer (if you have the Dual/Tri Bed DIs, connect the units together with the cam level coupler). 3. Make sure deionizer is standing upright for use. 4. Flush out system for 2-3 minutes (gets out all the resin dust). 5. Connect outlet to point of use. 6. Your new unit is ready for use!
Recharging Directions:
Step 1: When output water quality has exceeded pre-determined level, or when spotting occurs, DI water is no longer being produced. Shut off water supply and remove tank head. Step 2: Empty resin into a waste container and rinse out tank. Dispose in accordance with federal, state, and local regulations. Step 3: Return distributor tube into the tank and place rubber cap over top of tube. Place funnel into top of the tank. Step 4: Slowly pour or scoop resin into tank. Shake or tap tank to get all of the resin bedded. Lastly, finish filling the unit with resin to within 2 inches of the top. Step 5: Remove funnel and rubber cap. Replace tank head. Make sure all o-rings are properly seated. Ensure seating areas are free from foreign material. Apply silicone lubricant to surface of o-rings. Step 6: Connect the water source to the inlet of the deionizer. Turn on the water and flush out the system for 2-3 minutes (gets out all of the resin dust). The unit will now produce deionized water.
|
|
|
|
|
|
|